Wood Fence vs Vinyl Fence Material Cost Per Foot
Wood usually costs less per linear foot than vinyl on materials alone. Here is how to build both order lists and compare them fairly.
Most US fence posts go 762 mm (30 in) deep, but cold-climate states need deeper holes to reach below frost depth. Here is how to decide.
In most of the United States, a fence post hole 762 mm (30 in) deep and 254 mm (10 in) in diameter is a sound default for a 1.83 m (6 ft) fence with posts spaced 2.44 m (8 ft) apart. That depth suits mild and moderate climates where the ground does not freeze deeply. If you live in a cold-winter state, the answer changes: the hole should extend below the local frost depth so the footing is not pushed upward by freezing soil. Frost depth is not uniform across a state, so confirm the figure for your county with your local building department or a licensed contractor before you dig. The calculator's default assumes the 762 mm figure and adjusts concrete quantities from there.
The reason 762 mm is the starting point is leverage. A post set one-third of its above-ground height into the ground resists lateral load from wind and leaning. For a 1.83 m (6 ft) post, roughly 610 mm (24 in) is buried and the rest stands above grade, so a 762 mm hole gives margin for a concrete footing and a gravel base. That rule of thumb holds in most of the country, but it is a starting point, not a code.
Frost heave is the mechanism. When soil freezes, water in it expands and lifts anything embedded in the frozen layer. A post footing that sits inside the frost zone gets pushed up unevenly, which racks gates, loosens rails and cracks concrete collars. The fix is to bear the footing below the frost line, where soil stays unfrozen year-round. In northern states the frost depth can reach 1.2 m (48 in) or more, which means a 762 mm hole is too shallow for a stable post.
Frost depth varies by region, elevation and soil type, and it is mapped by county rather than by state. The National Weather Service and the USDA publish frost depth data, and many local building departments publish the design frost depth used for footings. Ask your authority having jurisdiction for the figure that applies to your address. Do not assume a neighboring state's number applies to you, and do not treat any single depth as a legal requirement until your local office confirms it.
Take a straight 18.29 m (60 ft) run at the default 2.44 m (8 ft) post spacing. That gives 8 bays, so 9 posts including both ends, 8 panels, 16 rails (2 per bay) and 8 gates only if you add them. At the default 254 mm by 762 mm hole, each hole is about 0.039 m³, and an 80 lb bag of concrete yields about 0.017 m³, so each post needs roughly 3 bags. Nine posts means about 27 bags.
Now move the same fence to a cold-climate site where the frost depth requires a 1.22 m (48 in) hole. Hole volume rises to about 0.062 m³ per post, or roughly 4 bags each, so the run needs about 36 bags. That is the practical cost of frost protection: deeper holes, more concrete and more digging time. Enter your actual hole depth into the fence calculator and it will return the revised bag count and material cost for the whole run.
The 762 mm default is reasonable for mild-winter regions, for short decorative fences, and for posts anchored to an existing concrete slab or set in a sleeve. It is not adequate where frost penetrates deeper, on slopes where water collects, in loose sandy or fill soil, or for heavy gates that concentrate load on two posts. In those cases increase depth, widen the hole to 305 mm (12 in), or both.
Soil matters as much as climate. Clay holds water and moves with freeze-thaw cycles; gravel drains well and settles less. If you are unsure, a local fence contractor can tell you what depth holds in your area, and your building department can confirm whether a permit and inspection apply. Neither the calculator nor this article replaces that local confirmation.
Before digging, confirm three things: the frost depth for your county, any permit requirement for fences over a set height, and whether your homeowner association imposes its own rules. Then measure your post height, spacing and hole diameter, and run the numbers. Keep the hole bottom flat and bell-shaped slightly at the base for better resistance to uplift, and set posts in concrete rather than tamped soil where frost is a factor.
Record the depth you used so future repairs match. If a post heaves after a hard winter, that is evidence the footing sat above the frost line, and the fix is a deeper hole, not more concrete at the same depth.
In mild and moderate climates, a 762 mm (30 in) hole is a common default for a 1.83 m (6 ft) fence with posts at 2.44 m (8 ft) spacing. In cold-winter states, frost can reach well below that, so the footing should extend below local frost depth. Confirm the figure for your county with your building department.
Frost depth is mapped by county, not by state. Ask your local building department for the design frost depth used for footings, or check National Weather Service and USDA frost data for your region. A local fence contractor will also know what depth holds in your soil. Treat any single number as a starting point until your authority confirms it.
Yes. At 254 mm diameter, a 762 mm hole takes about 3 bags of 80 lb concrete, while a 1.22 m hole takes about 4. Deeper holes also mean more digging. Enter your actual depth into the fence calculator to get the revised bag count and material cost for the full run.
Permit rules vary by state, county and city, and often depend on fence height, location and whether the fence is on a property line. Some jurisdictions require no permit for low residential fences; others do. Check with your local building department before digging, and check any homeowner association rules as well.
Heaving usually means the footing sat inside the frost zone. The durable fix is to reset the post in a deeper hole that reaches below local frost depth, with a slightly wider base, rather than adding concrete at the same depth. Confirm the correct depth for your county first so the repair does not repeat next season.
Use your own measurements, panel width and post spacing. The tool returns posts, panels, pickets, rails, concrete bags and a material cost.