Call 811
In most US states you must call 811 (or your local one-call centre) a few working days before digging so buried utilities can be marked. It is free.
Free · No sign-up · Works offline
Work out every post, panel, pale and bag of concrete before you buy. Dimensions, units and prices default to your region — change anything you like.
US Showing United States standards: imperial units and USD pricing.
Schematic of the run, not to scale. Gate openings are shown in place.
In most US states you must call 811 (or your local one-call centre) a few working days before digging so buried utilities can be marked. It is free.
Southern states can get away with 18–30 in holes; northern states and Canada need 36–48 in. Posts that sit above the frost line heave every winter.
Many municipalities limit fence height to 6 ft at the rear and 4 ft at the front, and HOAs often have their own rules. Check before ordering.
Everything on this page comes from these five steps. Change the inputs and the maths follows.
A gate splits the line into separate runs. Each run is divided into bays no wider than the post spacing, rounded up, so posts = runs × (bays + 1). The real spacing is the run length divided by the number of bays.
posts = runs × (bays + 1)
Hole volume = π/4 × diameter² × depth. The post footprint is subtracted, and the remainder is multiplied by the number of posts, then divided by the yield of one bag and rounded up.
V = π/4 · d² · h − post
Per bay: (bay length − pale width) ÷ (pale width + gap), rounded down, plus one. That guarantees no gap is wider than the one you asked for.
⌊(bay − w) ÷ (w + gap)⌋ + 1
Each material quantity is multiplied by the unit price you see in the form. Waste allowance is applied to pickets and screws because those are the items that get cut and dropped.
total = Σ qty × unit price
With posts at 8 ft centres a straight 100 ft run needs 14 posts: 12 full 8 ft bays plus one 4 ft closing bay. The calculator reports the exact figure for your spacing, and adds the posts either side of each gate.
A 10 in hole 30 in deep takes about two 80 lb bags once the 4x4 post is in place. Wider augers or deeper holes need proportionally more — the calculator works out the volume and rounds up to whole bags.
8 ft (2.4 m) centres for panels and paling fences; 6 ft (1.8 m) for heavy closeboard panels or exposed, windy sites. Never exceed the panel width or you will be cutting panels down.
Divide the bay length by the pale width plus the gap, round down, then add one. An 8 ft bay with 3.5 in pales and a 0.5 in gap works out at 24 pales per bay.
It uses typical retail prices for your region, and every price is editable. It covers materials only: labour, removing the old fence and disposal are separate.
In England and Wales a fence over 2 m, or over 1 m next to a highway, usually needs planning permission. In the US and Canada the rules come from the municipality or HOA. In Australia and New Zealand check state or council rules, and always confirm who owns the boundary first.